I need technical help from your engineer for electrical / instrument and control system. I have a duct bank concrete type within are PVC Conduits, so one duct bank is having 13.8KV power cables in them. I want to run communication/instrument and control system separate concrete duct bank (not same duct bank mind you) in parallel with this power duct bank, but i have space constraint maximum 100mm corridor distance in between these i can keep, can it be done? or any way to put some insulating material in between etc.
AJAZ UL HAQ Changed status to publish May 8, 2023